Renovate gets no release timestamps for Docker Hub images with more than 1000 tags (https://github.com/renovatebot/renovate/issues/46925) or for quay.io, so the 5-day minimum release age holds them back forever. The e2e workflows, the Kubernetes examples and the toolkit test pins are outside its managers, so these are bumped by hand.
The builder follows the current Alpine instead of the frozen 3.23.
Reviewed-on: https://gitea.com/gitea/runner/pulls/1330
Reviewed-by: bircni <bircni@icloud.com>
Co-authored-by: silverwind <me@silverwind.io>
Jobs occasionally go silent ([example](https://gitea.com/gitea/runner/actions/runs/805045/jobs/1055123)) mid-run and Gitea reaped them after `ZOMBIE_TASK_TIMEOUT`, with no error in the log. This contains a number of related fixes, all with full test coverage:
1. Bound every RPC to Gitea with a timeout, a stalled report otherwise parked logs and heartbeats for the whole job.
2. Cap `runner.fetch_timeout` at that ceiling.
3. Let only the daemon loop close its own channel, the race panicked the process.
4. Stop the job on any terminal server result, not just `RESULT_CANCELLED`.
5. Report that result instead of relabelling it as cancelled.
6. Log reporting failures once at each end of an outage instead of discarding them.
7. Clamp the acknowledged log index, a too-large ack panicked on a slice bound.
8. Stop reading server health from a `FetchTask` deadline, it marked the runner healthy and reset the error backoff on a timeout.
9. Return an error from the Docker version probe instead of a `logrus` panic.
10. Pass the context to go-git's fetch and pull.
11. Fail the clone when a refresh dies on a cancelled context.
12. Set `terminationGracePeriodSeconds` in the Kubernetes examples.
Also contains a deprecation fix for goreleaser.
Reviewed-on: https://gitea.com/gitea/runner/pulls/1174
Reviewed-by: bircni <bircni@icloud.com>
Co-authored-by: silverwind <me@silverwind.io>